Freedom Forever Updates

Lightspeed Portal & Cash and Loan

December 2024

Massachusetts NEM Cap - Spring 2025

The Massachusetts Department of Public Utilities (DPU) issued an order expanding access to net metering for solar customers. The order revises regulations to increase the project size threshold for participating in the state’s net metering program without being subject to the net metering cap. Specifically, the updated regulations increase the threshold for facilities to net meter without a cap allocation from 10 kilowatts (kW) to 25 kW, resulting in these facilities’ eligibility for a higher net metering credit value. 


For these revisions to be fully implemented, the electric distribution companies (EDCs)--Eversource, National Grid, and Unitil—must submit new tariff filings to the DPU in January 2025. Once the filings have been submitted, the DPU will commence proceedings to update the tariff provisions. 


Systems that are submitted for interconnection after the regulations are published in December will not be subject to the cap, however, they will not receive full net metering until the utility tariffs are updated (anticipated between March and May of 2025). Net metering credits will be backdated and granted to these customers upon the release of the updated tariffs. 


The new regulations regarding the net metering cap are anticipated to be published on or around December 20th. Freedom Forever will be holding off on submitting any in-progress Massachusetts projects for interconnection until that time to seamlessly enroll customers with systems over 10kW into the net metering program. 


More details are expected to be released regarding the reclassification of projects over 10kW that have been submitted for interconnection prior to the publication date of the new regulations. Resources 


Mass.gov Press Release 

D.P.U. 23-140-A 

Secondary Credit Check Backup

Experian Added as Secondary Bureau for TPO Apps

Enfin has added Experian as a secondary credit bureau for TPO applications! This enhancement helps ensure more comprehensive credit checks and smoother processing.

What This Means for You:

● Better Coverage: Applications will now be assessed using an additional credit source.

● Improved Accuracy: Helps reduce the chance of incomplete or inconclusive credit decisions.

Puerto Rico No Small System Adder

No more small system adder.

See Adder Sheet

Solicitors Permits

When onboarding reps in a new territory or you have sales seems going into a new territory, please make sure that they have the required solicitors permits to sell. It is crucial that they list your dealership as the dealer and not Freedom. 

Licensing Information

Base Module Adjustment

December 11th, the base module in CT, MI, NH, RI and VA for certain financiers will be changing. For the latest pricing and availability

See Adder Sheet

Tesla Powerwall Supply

Status 

● TPW3 supply is expected to be low for the next several months 

● We may see install delays on TPW3 jobs 

● All depends on supply from Tesla 


Plan 

● Freedom will not be mandating swaps to other batteries 

● Will install as supply permits 

Freedom Forever will open a ticket on all jobs that qualify for the offer.


Offer 

● Offering current SolarEdge battery pricing to TPW3 jobs 

● Revision fees will not apply 


Action

Select the appropriate resolution option in the ticket.

Please work through the ticket when possible to minimize confusion


review the announcement

Solar edge battery sales materials

If you would like to get ahead of the upcoming shortage you can select one of the following options 

● SolarEdge battery pricing for these swaps will be based on the current adder pricing 

● While the Live SOW team will be available to assist with these changes, we ask that you work through the specific ticket whenever possible to minimize confusion and ensure the job is adjusted appropriately. 

Baseline Adjustments

Baselines for Cash and Mosaic projects will see a reduction of $.05-$.10/W in many states! Meanwhile, Sunnova non-retail baselines will increase in most markets.   Sunnova non-retail baselines will increase in most markets in the near future. 

See Adder Sheet

Base Module Change

Effective December 3rd, the base module for Cash and Mosaic projects in all states (except Puerto Rico) will be the Freedom Forever 400W module at no adder! For pricing and availability, check the latest adder sheet linked below 

See Adder Sheet

November 2024

Tesla Battery Supply Chain Issues

Lowering cost of solar edge batteries to help offset for the Tesla Powerwall shortage.

watch the video

See Adder Sheet

Base Module Changes

November 7th, Trina modules of various wattages will be the base module in all markets for several financiers.


QCells 410W will still be accepted through the end of today in markets moving to Trina. Only Trina will be able to be submitted starting November 8th.

See Adder Sheet

Now in Kansas

Loan: Mosaic 

Lease: Sunnova *Coming Soon 

PPA: Not Available 

Cash 



Net Energy Metering (NEM) 

Kansas Market Guide

Change in Support Email

Our previous email address, dealersupport@freedomforever.com, will officially close on 12/1/24. From 12/1/24 and moving forward, we will only be replying to emails that come into the dealeradmin@freedomforever.com inbox!

Compliance Deadline December 5th

Freedom Forever is launching an updated compliance course to keep our Independent Authorized Dealers aligned with the latest industry regulations and best practices. This course will be added to onboarding for new reps and assigned to all current reps.  

 

The goal is to ensure that everyone is up to date with compliance standards, reinforcing our commitment to being knowledgeable and reputable. 

 

Additionally, sales reps in California will complete a specialized California HIS Compliance course, covering the importance of HIS compliance for all current and future California-based reps. 


Existing ProClass Academy Users 

If you already have an account in ProClass (Docebo), simply log in and start the course directly from your dashboard. 


New ProClass Academy Users 

If you’re new to Proclass (Docebo), follow these steps to access the course: 

For any questions or assistance, contact the Product Education team via the button below!


Compliance Course Details

October 2024

Domestic Content Webinar

Inflation reduction act leverages USA manufacturing to strengthen the renewable energy industry.  A certain percentage of materials used need to be sourced from the United States.  Projects meeting these criteria can meet additional tax credits reducing project costs.  


You will see this trend helping TPO products.

Watch here

You can now sell in Michigan

Market Guide

September 2024

Base Module Change

Effective September 21st, the QCells 410W are the base module for all finance types in all markets.

For pricing and availability, check the latest adder sheet

August 2024

New Baselines

Baselines for Everbright and Sunnova increased by $.10 across the board effective 8/20/2024.  

Check out the latest Adder Sheet

Illinois will be Tier 1

The entire state will be tier 1 on 9/1/2024

Missouri Tier changes in SW Missouri

If volume does not increase, Freedom will have to close out those zips.

W9 Policy Update

PTO Update

New Training Coming

New Lightspeed Training coming with an exam

30 days to complete, if you don't complete your access will be paused in Lightspeed.

Give Freedom with Give Power


Learn More 

Introduction Video

July 2024

New Base Module

Effective immediately, the Silfab 430W will be the base module in most markets. For more information, check out the latest Adder Sheet

Jinko Module Swaps


Due to supply shortages, a number of jobs sold with Jinko 385s and 390s will be swapped to Silfab modules in the coming weeks. 


The good news is on all loan products, the wattage per panel will increase, so system sizes will also likely increase, which will help offset the reduction in net PPW that will result from the system size increase. Net commissions should not change dramatically either direction, at most a couple hundred dollars with some of the panel swaps needed.



For more on these changes, please refer to the module swap guidance.

See more about the SOW Approval process

Actionable Customer Notifications

Customers can now mark that they've completed an action through the Customer Notifications within Sales tickets.  


When that happen, a resolution option "Customer marked resolved" will automatically be selected on the ticketand it will re-assign back to Ops.  Users can revew the project and select either "Mark Resolved" or "Send Back to Sales" which will prompt a note field.  Use this field to outline why the resolution was rejected and what needs to be changed.

Florida Market Update

Updated Tiers

FL HOI Adders is now $250

NEM Sunsetting | IL & AR


NEM sunsetting in Illinois and Arkansas.  Both moving to an "Export rate" / "net billing tarriff"


Illinois


Please ensure all required utility documents are provided promptly to avoid delays and prioritize pending sales tickets for customers in the affected market.


See announcement (PDF)

See Billing acknowledgement (PDF)


Arkansas


Specific details surrounding the requirements for grandfathering under the current Net Metering program are still being confirmed with our active utilities. Additional information will be shared as it becomes available.


See announcement (PDF)

See Billing acknowledgement (PDF)

June 2024

SolarEdge Batteries

Effective immediately, the SolarEdge 10kWh battery pricing is being reduced by $950. 

Design / Pre-Sale / In-home Support (Co-Pilot) 


(951) 528-2100


This should be your first call when you have a problem

Available 7 Days a Week. M-F 6am-7pmPsT Sat-Sun 8am-4:30pm PST

For when you need assistance to help avoid leaving home without a signed and submitted deal.

Phone support launch coming in August

Modification of Adders

On 6/26/2024 the majority of adders from our current list for all sales moving forward! This new change will help simplify the Scope of Work process for our teams and give sales more assurance with the price they originally discussed with their customers.


Here are some of the highlights, with the full adder sheet linked below!


*New sales only. Not applicable when requested by rep or customer

Freedom Advantage Changes


Freedom Advantage service will include the following:


The best part—Freedom advantage will be FREE for all projects sold by reps above 50% Realization Rate, beginning July 1!


How will Freedom pay for this?


While we are excited about this new direction, it will come at a cost. We have chosen to adjust baselines for several finance companies in most markets.


We believe this shift will have a major impact on your business and will streamline and simplify your processes. Please reach out to your sales leaders for more information.

No Freedom Forever onboarding training to complete in EdApp?

If you do not have any trainings in EdApp for that are still pending, then you are all set! As new trainings become available, we will notify you to enroll for our new LMS, ProClass Academy.



Still have training to complete in EdApp?

Make sure to have them completed by June 30th, 2024, to finalize your onboarding prior to joining us at ProClass Academy. Any training that is incomplete as of July 1st, 2024, will need to be retaken in ProClass Academy.

Project Support Updates

The following Holding Stage updates will help prevent delays with Account Management moving projects out of Holding and helps avoid unnecessary rework and potential delays.

Account Management team will no longer be actioning "At Risk Project Review" tickets in SOW stage and earlier

Projects will move to Holding Stage after the 6th collection attempt

Current Projects in Holding Stage - Prior to 06/10/24

Live SOW

March 2024

Mosaic Loan Document Integration 


Mosaic Loan Documents will now be added to the DocuSign process when generating a project in LIGHTSPEED!


With this new improvement, once a loan application is approved in Aurora, the loan docs will automatically be added to the sequence of documents sent to the customer’s email via magic link. If you missed last week’s webinar that goes over this process in detail, you can review below. 

December 2023

PayKeeper

PayKeeper acts as a secure and transparent financial bridge while your customer’s projects are being completed. The platform aims to greatly improve the cash payment process for our customers.


Check out the webinar below for everything you need to know! Some key topcis covered are:

November 2023

New Sales Mode Update Coming in November

New Freedom x Vivint Smart Energy Package

There will no longer be an adder for the Vivint smart home basic smart home kit. This new DIY package can be installed by the homeowner with assistance from the Freedom site audit technician, eliminating the need for a separate site visit. 


Low Income Bonus Federal Incentive

August 2023

Free Canvasing App

A new Volt app update is now available! Optimizations and bug fixes include:


Volt is free to use for all sales reps that use Freedom Forever

October 2023

Puerto Rico is now Live

Freedom Forever is now operating in Puerto Rico.